翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Central-Mid-Levels escalator : ウィキペディア英語版
Central–Mid-Levels escalator and walkway system

The Central–Mid-Levels escalator and walkway system in Hong Kong is the longest outdoor covered escalator system in the world. Engineered by French company Constructions industrielles de la Méditerranée the entire system covers over in distance and elevates over from bottom to top. It was constructed in 1993 to provide a better commute by linking areas within the Central and Western District on Hong Kong Island.
==History==

The proposal of the project began in November 1987, when the Government faced the problem of increasing vehicular traffic in Mid-Levels.〔Brian Wong,(HK's lofty plan for world's longest moving walkway is a step nearer ), ''South China Morning Post'', 4 November 1987〕 It was an "outside the box" transportation solution generated by a group of civil engineers working for P & T Architects & Engineers Ltd.
In operation since 1993, it cost HK$240 million (US$30 million) to build although it was originally approved in March 1990 with a budget of HK$100m and annual maintenance costs of $950,000. Since its conception in March 1987, its scope and its budget were considerably increased.
In November 1996, the Director of Audit issued a report which criticised the project as being a "white elephant", saying that it failed to achieve the primary objective of reducing traffic between the Mid-Levels and Central, as well as over-running its budget by 153%. The Highways Department's poor handling of the project was the main reason for having five cost revisions of the project since the budget had been initially approved. The Director of Audit blamed it for failing to address the risks and complexities associated with the project in the pre-tender estimates, and costs rising because of delays.〔Yonden Lhatoo, (Escalator 'a costly white elephant' ), ''The Standard'', 6 November 1996〕 Land resumption costs were also underestimated by $74 million (or 180%). The report also points out that a "before-and-after" study by the Transport Department indicated no obvious reduction in traffic congestion.〔
Since the escalator system opened, most pedestrians gather at the elevated level; previously they gathered at the street level. This has opened up large tracts of intermediate levels above ("SoHo") and below ("NoHo") Hollywood Road, to pedestrians and commerce. Many restaurants have opened around all the elevated level, in the first or second floors of buildings already present.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Central–Mid-Levels escalator and walkway system」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.